CMS Status The status of the construction and installation of the CMS detector is reviewed. Nearly all the mechanical components of the sub-detectors have been been assembled at the surface hall SX5. The commissioning phase of CMS has successfully started with the combined slice cosmic challenge and magnet test [MTCC]. The lowering of the detector components in the underground cavern commences this fall.