First a tragedy, then farce
Physics World 21:9 (2008) 14-15
First data from the linear collider alignment and survey project (LiCAS)
EPAC 2008 - Contributions to the Proceedings (2008) 1344-1346
Abstract:
The LiCAS project has developed a prototype robotic survey system for rapid and highly accurate surveying of long linear accelerator tunnel networks. It is aimed at the International Linear Collider (ILC). This Rapid Tunnel Reference Surveyor (RTRS) is an R&D instrument for evaluating the performance of the RTRS concept and its survey technology. The prototype has been commissioned in a test tunnel at DESY with initial calibrations and measurements ongoing. We will report recent results where they improve over previously reported work.Measurement of isolated photon production in deep-inelastic scattering at HERA
European Physical Journal C 54:3 (2008) 371-387
Abstract:
The production of isolated photons in deep-inelastic scattering ep→eγX is measured with the H1 detector at HERA. The measurement is performed in the kinematic range of negative four-momentum transfer squared 4Micron size laser-wire system at the ATF extraction line
EPAC 2008 - Contributions to the Proceedings (2008) 1065-1067
Abstract:
The KEK Accelerator test facility (ATF) extraction line laser-wire system has recently been upgraded allowing the measurement of micron scale transverse size electron beams. We report on the hardware upgrades, including focusing lens, laser diagnostics and mechanical systems. The first measurements using the new system from recent operation at the ATF are presented.Nanometre precision interferometric stability monitoring systems for key accelerator components
EPAC 2008 - Contributions to the Proceedings (2008) 1350-1352