Aligning the CMS Muon Chambers with the Muon Alignment System during an Extended Cosmic Ray Run

ArXiv 0911.4770 (2009)

CMS Data Processing Workflows during an Extended Cosmic Ray Run

ArXiv 0911.4842 (2009)

Calibration of the CMS Drift Tube Chambers and Measurement of the Drift Velocity with Cosmic Rays

ArXiv 0911.4895 (2009)

Commissioning of the CMS Experiment and the Cosmic Run at Four Tesla

ArXiv 0911.4845 (2009)

Commissioning of the CMS High-Level Trigger with Cosmic Rays

ArXiv 0911.4889 (2009)